Roofing · Pitched or flat roof
Roof renovation in Brussels, Flanders and Wallonia
A roof in good condition protects the whole house, and an insulated roof greatly reduces heat loss. Repairs, re-roofing or a full renovation with insulation: a RhinoEnergy adviser reviews your project with you, then puts you in touch with up to 3 contractors in your area.
You are…
This changes the grants you are entitled to.
Free, no commitment. Your data is never sold.
- Of heat loss can escape through an uninsulated roof
- Up to 30%
- Of heat loss can escape through an uninsulated roof
- Typical lifespan of a roof covering, depending on the material
- 30 to 60 years
- Typical lifespan of a roof covering, depending on the material
- VAT in a private home more than 10 years old
- 6%
- VAT in a private home more than 10 years old
- A home protected from leaks
- Less heat lost through the roof
- A roof ready for solar panels
When should you renovate your roof?
Slipped tiles or slates, damp patches in the attic, a missing or damaged roofing membrane, persistent moss or cracked bitumen felt are all warning signs. The longer you wait, the more a small leak can damage the roof structure, insulation and ceilings, and the higher the bill.
A full renovation is also the right time to insulate from the outside, replace the zinc work and prepare for solar panels. Combining these jobs avoids putting up scaffolding twice and lowers the overall cost. It is also an opportunity to check roof ventilation and the condition of the gutters.
Pitched roof or flat roof
On a pitched roof, renovation generally involves removing the old covering, then fitting a breathable membrane, insulation, battens and the new tile or slate covering. External insulation, known as sarking, preserves the space under the roof and limits thermal bridges. The choice of material may also depend on the appearance required by your municipality.
A flat roof is renovated with a new waterproof layer, in EPDM or bitumen felt, laid on rigid insulation. The critical points are the edges, outlets and joints, where most leaks occur. A sufficient fall towards the outlets prevents standing water, which speeds up the ageing of the waterproofing.
Insulation, planning permission and grants
For a quality renovation, roof insulation generally targets a U-value of around 0.24 W/m²K or better, which means 15 to 22 cm of insulation depending on the material. Regional grants set their own performance requirements, which the contractor must meet. A properly fitted roofing membrane and vapour barrier ensure the whole build-up lasts.
Changing the appearance or volume of the roof may require planning permission: check with your municipality. Grants depend on the region and your income; the adviser calculates them for you and checks the conditions before work begins. Some schemes require documents to be submitted before the quote is signed.
Indicative prices 2026
How much does a roofing project cost?
Prices vary with the area, the covering material, the condition of the roof structure and access to the roof; 6% VAT in a private home more than 10 years old, 21% otherwise.
| Work | Range incl. VAT | Best for |
|---|---|---|
| Full pitched roof renovation, insulation included | €180 – €350/m² | Tiles or slates, membrane, insulation |
| Replacement of the covering only | €90 – €180/m² | Without insulation |
| Flat roof: waterproofing and insulation | €110 – €220/m² | EPDM or bitumen felt on rigid insulation |
| Spot repair or zinc work | €300 – €2,500 | Depending on access and extent |
Average ranges seen in Belgium, before grants. Only the quote issued after a site visit is binding.
With RhinoEnergy
From question to the right quote
- 1
2 minutes
You describe your project
A few simple questions online, no account needed. You get a first estimate straight away.
- 2
Within 24 working hours
An adviser calls you back
They check feasibility, the grants you are entitled to and a realistic budget for your home.
- 3
Within 2 weeks
You compare up to 3 quotes
Certified installers from your area visit your home. You choose freely, or no one at all.
Frequently asked questions
Roofing: your questions
How much does a roof renovation cost per m²?
For a pitched roof renovated with insulation, expect to pay generally €180 to €350 per m² including VAT. The price depends on the material chosen, the condition of the roof structure and the complexity of the roof.
Do I need planning permission to renovate my roof?
Like-for-like replacement generally does not require it. If you change the appearance, the visible material or the volume of the roof, planning permission may be needed. Your municipality will confirm.
Is it better to insulate from the inside or the outside?
External insulation is ideal when the covering needs replacing anyway. If the roof is in good condition, insulating from the inside is cheaper. The adviser helps you choose based on your situation.
Are there grants for roofing work?
Yes, mainly for insulation, subject to performance requirements. Amounts depend on the region and your income and change regularly: the adviser calculates them with you.
Our guides to go further
All guides
RenovationRoof renovation cost per m² in Belgium: prices, steps and grants
Tiles, slates or a flat roof: what a roof renovation costs per m² in Belgium, which steps to plan for and what support is still available in 2026.
7 min
End of Walloon grants: what changes on 1 October 2026
30 September 2026 is the last day to apply for a Walloon renovation grant. What replaces it, who qualifies, and what still remains afterwards.
8 min
Grants & aidMijn VerbouwPremie in Flanders: what changed in 2026
Since 1 March 2026, the Flemish renovation grant is reserved for lower incomes, except for heat pumps. Who still qualifies, for which works and how to apply.
7 min
Other projects in mind?
Solar panels
Generate your own electricity and cut your energy bill.
Prices, grants and quotesHome battery
Store your solar power and use it in the evening.
Prices, grants and quotesEV charger
Charge your electric car safely at home.
Prices, grants and quotesHeat pump
Heat your home without gas or heating oil.
Prices, grants and quotesYour roofing project, estimated in 2 minutes
Two minutes for a first estimate, an adviser to check it, up to three quotes to decide.


